Emberbank

Brick heat stores that charge at midday and give small factories steam all night

Climate Tech SMEs

TL;DR Emberbank puts electrically heated brick stores next to small factory boilers. They soak up cheap solar-hour power during the day and hand back steam or hot air through the night. The factory pays per tonne of steam, not for the kit, and keeps its old boiler as backup.

The problem

Plenty of Indian process plants, from dairies to textile dyeing units, need heat round the clock and burn coal, wood or oil to get it. Cheap clean power, meanwhile, shows up in one midday block.

Since April 2024 commercial and industrial users pay 10–20% less in the state-set solar hours and 10–20% more at peak[1]. Since 2022 a plant with 100 kW of demand can also buy green power through open access, and any surplus has to be banked[2]. So what does a factory running night shifts do with midday power? Nothing, unless it has somewhere to keep the heat.

We couldn't find a public figure for India's small-factory heat demand, and that is a gap you'll have to fill before you raise money.

The idea

What it does, in regulatory terms: electrical heating equipment that produces steam or hot air. The electrical side follows normal factory wiring rules. The steam side may fall under state boiler inspection, so check with the inspectorate before the first install.

The seed pitched thermochemical storage, which keeps heat in chemical reactions. That's still lab science - a 2020 study tested samples of about 10 mg and found the material still short of the conversion needed to compete with molten salt[3]. So we switched to plain sensible heat in brick, which firms abroad already sell. One overseas maker heats refractory brick to 1100–1500°C, charges for 6–8 hours and discharges for 24[4].

Emberbank's unit is sized for one factory boiler house. Resistive heaters warm a brick stack in solar hours and a fan pushes air through it to a heat exchanger that makes steam on demand. A controller reads the tariff and the plant's steam load and charges only what tomorrow needs. The factory pays per tonne of steam, priced below what its fuel costs today.

Who pays

The factory owner or plant head pays, and they'll hold your price up against the coal, briquette or oil bill. Charging per tonne of steam takes away the upfront cost that small firms just can't fund.

Start with food processors whose export buyers are asking for lower emissions, since they have a second reason to switch. There's no public price for steam-as-a-service in India, so you'll be quoting off each plant's own fuel bill.

Why now

Time-of-day tariffs gave you a dependable midday price dip from April 2024[1]. Open-access rules have let 100 kW plants buy green power since 2022[2]. Abroad, the tech has moved past pilots into big units - one US maker announced a 5 GWh project with a big biofuel producer[5], and a Finnish firm runs sand stores for Finnish heat networks[6].

Market signal

We found no public figure for small-factory steam demand or boiler fuel spend in India. The signal is indirect. One overseas storage maker lists food and beverage, chemicals and paper among its target industries[5], and India has big clusters of all three.

If you want a real number then count the boilers and fuel spend in one cluster before you fund a pilot.

Who's already doing this

Overseas startups sell thermal storage in brick[4], carbon blocks[5] and sand[6], but they're sized for large plants or heat networks. We found no Indian company selling packaged electric heat storage to small factories, though our search was limited. Indian boiler makers sell fuel-fired and electric boilers and stop there.

The gap is a unit small enough for a 2–5 tonne-per-hour boiler house, sold as a service.

How hard is it?

Difficulty Hard (67/100)
Starting capital ₹3–6 Cr
Time to launch 18–24 months

This is real hardware at very high temperatures, and safety is not optional. The first unit will take a year to design, build and certify. Financing is the second wall, because selling steam means the equipment sits on your balance sheet and not the customer's. Each site also needs a grid connection big enough to charge fast.

Licences and approvals

Yes. This is high-temperature equipment making steam inside a factory, so safety approvals come before anything else.

  • Boiler inspection by the state boiler inspectorate if the unit makes steam under pressure [Requires validation]. Ask in writing before design freeze.
  • Load sanction and electrical inspector approval from the DISCOM and the state electrical inspector, before the first unit is energised [Requires validation].
  • Time-of-day tariffs set by each state commission, which your steam price depends on, so check slot hours before you quote[1].
  • Green Energy Open Access registration for plants of 100 kW and above that want to buy green power directly[2].
  • Company registration with the MCA and GST before you sign a steam contract.

Building this outside India? The categories above usually have a local equivalent, so check with your own regulator.

How AI can power this business

  • Charge planning. Forecast tomorrow's steam demand from the plant's production plan and history, then charge only what's needed in the cheapest tariff hours.
  • Heater health. Watch heater current and stack temperatures to spot failing elements early, before a unit misses a night shift.
  • Steam pricing. Model each prospect's fuel cost, tariff and load to quote a per-tonne price that still clears your financing cost.
  • Site screening. Rank factories by sanctioned load, steam use and fuel type, so sales time goes to plants that can actually charge in six hours.

Don't trust AI with safety interlocks. Temperature limits and trips must be hard-wired and certified, whatever the software says.

Want to work out the AI layer for Emberbank? Talk to Yash →

Biggest risks

Here's what can go south -

  • Fuel is cheap. If a plant burns cheap biomass then your steam price may never beat it.
  • Grid connection. Lots of small plants don't have the sanctioned load to charge in six hours.
  • Capital intensity. Owning units at every site needs debt, and lenders won't give it without an operating history.

Our take

I'd only back this with a founding team that has thermal engineering and boiler experience, plus patient money behind it. Software founders, honestly, should skip it.

Prove one number first - the delivered cost per tonne of steam at one real plant, against its current fuel bill, using real tariff data.

Questions founders ask

Plan for roughly ₹3–6 Cr, because you design, build and certify real hardware and often own the units at customer sites.

Do I need a licence to start a thermal storage business in India?

If the unit makes steam under pressure, the state boiler inspectorate may need to approve it, and charging needs a larger load sanction. Confirm both in writing before you build.

Can I start a brick thermal storage business in another country?

Yes, firms abroad already sell this kind of storage. Pressure equipment and grid connection rules differ, so check with your local regulator.

Download the kit

The free Emberbank validation kit has the line-by-line capital breakdown, the effort scoring, the electrical and boiler checklist, a 14-day validation sprint with pass/fail targets, a 90-day launch plan, 10 interview questions for plant heads, and 5 assumptions to test. Download the kit →

Talk to Yash

Thinking about building Emberbank or something close to it? The make-or-break work is a steam cost per tonne that beats the plant's fuel bill and a first unit that inspectors pass, and that's the kind of thing I help founders with. If you need a hand, you know where to find me. Talk to Yash →

Sources

  1. SolarQuarter, "India introduces Time of Day tariff and rationalizes smart metering provisions to enhance power tariff system", 2023-06-26. https://solarquarter.com/2023/06/26/india-introduces-time-of-day-tariff-and-rationalizes-smart-metering-provisions-to-enhance-power-tariff-system/
  2. Renewable Watch, "Ministry of Power notifies the Green Energy Open Access Rules", 2022-06-07. https://renewablewatch.in/2022/06/07/ministry-of-power-notifies-the-green-energy-open-access-rules/
  3. Durán-Martín et al., "Role of particle size on the multicycle calcium looping activity of limestone for thermochemical energy storage", Journal of Advanced Research, 2020. https://pmc.ncbi.nlm.nih.gov/articles/PMC6961220/
  4. Rondo Energy, official site, accessed 2026-10-21. https://rondo.com/
  5. Antora Energy, official site, accessed 2026-10-21. https://antora.com/
  6. Polar Night Energy, official site, accessed 2026-10-21. https://polarnightenergy.com/

For illustration only. Names are fictional and ideas hypothetical; sourced facts are real but may be out of date. Nothing here is legal, financial or professional advice, and Yash Khatri is not personally liable for any use of it. Read the full disclaimer.

Reviews

No reviews yet